The building in figures

  • Height above Des Voeux Road Central

  • 178.8 metres (586.6 feet)

  • Foundation depth below ground level

  • 34 metres (111.5 feet)

  • Basement depth

  • 18.8 metres (61.7 feet)

  • Air- conditioning seawater intake system tunnel below ground level

  • 75 metres (246.1 feet)

  • Building levels

  • 52 levels - 47 above ground, four below ground and the Plaza at ground level

  • Gross area

  • 99,171 m2 (1,067,467 ft2)

  • Usable area

  • 70,398 m2 (757,757 ft2)

  • Floor areas

  • Largest
        3,215 m2 (34,607 ft2) gross
        2,656 m2 (28,590 ft2) net
    Smallest
        976 m2 (10,505 ft2) gross
        687 m2 (7,395 ft2) net
    Public plaza
        3,514 m2 (37,826 ft2)
    Main banking halls
        2,178 m2 (23,445 ft2)

  • Teller positions

  •     44 on Level 3
        44 on Level 5
        28 on Basement Level 1

  • Vault door and frame

  • 50 tonnes - Basement Level 1

  • Atrium (height from plaza)

  • 52 metres (170 feet)

  • Sunscoop

  • Exterior - Level 12
        480 computer-controlled glass mirrors
        Weight - 32 tonnes
    Interior reflector
        225 aluminium mirrors

  • Number of staff accommodated

  • 5,000

  • Internal transport

  • Lifts
        23 passenger and five goods
    Escalators
        62 - including the longest freely supported escalators in the world running from the Plaza to Level 3
        (25 metres, 82.5 feet)

  • Structural steel

  • 27,000 tonnes

  • Overall steel (including reinforcement)

  • 30,000 tonnes

  • Aluminium

  • Cladding
        3,500 tonnes
        93,000 m2 (1,000,000 ft2)
    Raised floor
        1,000 tonnes

  • Concrete

  • 35,000 m3 (1,236,013 ft3)

  • Glass

  • 32,000 m2 (344,444 ft2)

  • Modules

  • 139

  • Electrical and communication cabling

  • Over 3,600 km (11,880,000 ft)

  • Electrical capacity

  • 19,500 kVA

  • Stand-by generators

  • 6 megawatts

  • Air-conditioning capacity

  • 12,500 kilowatts

  • Construction

  • Began
        Basements - November 1981
        Structural steel - January 1983
    Completed
        November 1985
    Phased occupation
        From July 1985

  • Costs

  • HKD5,227 million

  • Project consultants

  • Architects
        Foster Associates Hong Kong
    Management contracto
        John Lok/Wimpey Joint Venture
    Structural engineers
        Ove Arup & Partners
    Services engineers
        J Roger Preston & Partners
    Quantity surveyors
        Levett & Bailey in association with Northcroft,
        Neighbour & Nicholson